- Solar and electric water heating system housed in an external shed.
- 1m paving around the house.
- Topsoil garden preparation.
- Air conditioning in all rooms. (split units).
- Preparation for a heating system with radiators (electrical).
- Provision for installation of photovoltaic panels.
- Metal railings around the plot
- Pergola 3m x 6m
The houses will be entirely stone built and will use red tiles on the roof. I attach photos of similar (not exactly the same) homes built by the company on the same road.
Delivery to be 12 months’ time from the day of signing a contract of sale.